• 3.jpg
  • foto 1.jpg
  • c.jpg
  • a.jpg
  • l.jpg
  • 0.jpg
  • foto 4.jpg
  • i.jpg
  • 01.jpg
  • 2.jpg
  • 8.jpg
  • 1.jpg
  • g.jpg
  • d.jpg
  • 7.jpg
  • 2012-08-14 13.20.08.jpg
  • 6.jpg
  • 4.jpg
  • 2012-07-23 13.04.17 640x480.jpg
  • 5.jpg

INCENTIVES AND COLLECTION PRACTICES

Power Solutions deals with the management of red tape in obtaining incentives and documentation required for the dedicated withdrawal, managing:
Incentives for practices: preparation of documents necessary to obtain the incentives provided by the Energy Account for the construction of fotovoltaci plants, which produce energy using renewable sources of energy.
  • Renewable energy incentives
  • Management Practices of obtaining recognition of qualification IAFR plant powered by renewable sources, preparatory to the next release of incentives; Qualification of plants fed by renewable sources, recognized by the GSE, the next release is preliminary, subject to certain conditions, depending ertificati green electricity produced, or as a function of the incentive fee inclusive of electricity produced and fed into the grid.
  • Management Practices obtaining release of Green Certificates: on balance, according to the energy actually produced by the net than in the previous issue, estimates, depending on the net waiting for manufacturability of the system.
  • Management Practices obtain Green Certificates or all-inclusive tariff, where required.
  • Obtaining practical incentive of solar thermodynamic
  • Preventive Management Practices Verification:
  • Records Management for prior verification of compliance of the design of solar thermal power, or a hybrid, the provisions of the Decree of 11 April 2008 to obtain a certificate of eligibility to the incentive system of the plant.
  • Preliminary design of the solar thermodynamic
  • Data processing plant engineers to determine the minimal technical conditions for admission encouraging (fluid, thermal fluid accumulation, intercepting surface, data on the thermal storage system, how to connect to the grid, in If insert mode hybrid plants from solar thermal energy in the conventional thermodynamic cycle).
  • Management Practices required thermodynamic solar incentive:
  • Management Practices required for approval of incentive rate processed by following the instructions in DM 11 April 2008, the AEEG n. 95/08.
  • a. registering (if not already in possession of credentials) and access to the portal for the promotion of CSP;
  • b. technical characteristic data entry system;
  • c. 5 different upload photographs of the facility;
  • d.stampa the technical end of the installation;
  • e. submit final documentation of system design, installation test certificate, declaration in lieu of the notarized affidavit, a copy of the complaint filed to open shop electrical UTF (for systems above 20 kWp;
  • f.stima the overall performance of the thermodynamic cycle, the system of concentration and the system of production of electricity and any other useful element in the determination of net production and net production attributable to the non-solar sources (hybrid plants).
Practices for the dedicated withdrawal: procedures for the sale of electricity fed into the grid, not self-consumed by their users, the GSE, which plays an intermediary role between commercial producers and the electricity system of buying and selling electricity and dealing management of access to the electrical system (dispatching services and transport in input).